Nozzle Pipe for Pelton Turbine

Home >> Products >> Others >> Nozzle Pipe for Pelton Turbine

Nozzle Pipe for Pelton Turbine

Nozzle is the conical contraction tube at the end of the pelton turbine pressure pipeline

About Getai Hydropower

We are a leading and professional turbine manufacturer of China. Our main products include quality hydroturbine and relevant accessories, including Pelton turbine runner, Francis turbine runner, Kaplan turbine runner, distributor, guide vane, blade, nozzle pipe, spiral case, conical pipe, elbow pipe, etc. for hydroturbine.

We made the first integrally-forged CNC-machining Pelton turbine runner in China in 2009, and the first integrally-forged CNC-machining Francis turbine runner in China in 2017.

Now our products are popular in more than 30 provinces in China and 20 countries all over the world, including the USA and Canada in North America; Japan, India, Pakistan, Viet Nam, Laos, Nepal in Asia; Serbia, Slovenia in Europe; Peru, Chile, Brazil in South America; Congo Kinshasa in Africa; Australia, Papua New Guinea in Oceania.

 

We are able to manufacture mono-block cast and forged steel CNC machining Pelton runner. Our Pelton runners are highly efficient, cavitation and wear resistant and coated with HVOF, and therefore have high performance, which can help the power station to bring more economic profits.

We are also able to perform the Pelton runner repair and renovation project through repair welding. The repaired products can also reach high value of performance, and can save the costs for the clients.

 

Cast Steel CNC-machining Nozzle Pipe for Pelton Turbine

 

Nozzle Pipe for Pelton Turbine

 

2. All raw material strictly conform to international standard, key component such as runners, guide vane is Forged and entire CNC machined.

Chemical Composition for ASTM A473 S41500 and ASTM A743 CA6NM(%)

Material No. C Si Mn P S Cr Ni Mo
ASTM A473 S41500 ≤0.05 ≤0.60 0.5-1.0 ≤0.030 ≤0.030 11.5-14.0 3.5-5.5 0.40-0.80
ASTM A743 CA6NM ≤0.06 Max1.0 Max1.0 ≤0.040 ≤0.030 11.5-14.0 3.5-4.5 0.40-1.0

 

Mechanical Property for ASTM A473 S41500 and ASTM A743 CA6NM

Material No. σ0.2(Mpa) σb(Mpa) δ5(%) ψ(%) Akv (J/cm2) HB
ASTM A473 S41500 ≥620 ≥795 ≥15 ≥45 ≥50 ≤295
ASTM A743 CA6NM ≥550 ≥755 ≥15 ≥35 ≥50 ≤285

 

3. State of the art machining and testing equipment, as well as licensed professional engineers all combined to help guarantee better product precisioness.

Nozzle Pipe for Pelton Turbine

4. All product is subject to strict inspection according to international standards and client special requirements.

Nozzle Pipe for Pelton Turbine


5. Each project will strictly follow manufacturying plan to ensure the delivery date.

Nozzles

Nozzle Pipe for Pelton Turbine

Applicable Standard

We could produce product according to inerntational standard and special client requirements. The standard we use include but not limited to the following:

● IEC Standard fro equipment and testing

● ASTM Standards

● CCH70-3 Specification for inspection of steel castings fro hydraulic machines

● EN (UNI-DIN) Standards

● JIS Standards

● ISO 1940-1-2003 Mechanical vibration-Balance quality requirements for rotors in a constant (rigid) state

● ASME-Bioler and Pressure Vessel Code

● - Section II - Material Specifications Part A-Ferrous

● - Section VIII - Pressure Vessels-Division 1

● - Section IX - Welding and Brazing Qualifications

 

Service

We dedicated to develop the best products and solutions for you in our role as specialists, to help unleashinging your potential and generate more power with our customized solutions!

● Hydro Power Plant assessment

● Inspections and offer customized solution

●Plant Maintenance

● Offer Spare parts

● Troubleshooting

● Consulting, installation guidance, site testing ect. field services

● Training

 

Why Choose Us

● More than20 years of successful hydro turbines design,production and exporting experience,Long timecertified suppliers for world renowned companiessuch as: MITSUBISHIHITACHI POWER SYSTEMS, LTD.(MHPS), Toshiba, GE, BHEL, ALSTOM, DEC,HEC, CHD ect.

● Continuous investment in both state-of-the-art facilities and R&Dsupport us to be strong and powerful in the market,high performance versus price ratio product, we could help achieving your goals within budget and time frame.No cheating, No excuse, No purposed delay is what we always try to guarantee our partners!

● Wegot many national patents for our products, and all productsconform to EU, ASTM, ISO, IEC, JIS etc. international standards.

● Quick and professional responseto your request for drawings, quotations, and answers about any technical problems. We do our best to realize our commitment to you that: whatyou see and hear is what you will get, whatever customer you are, big or small. In the mean time, we implement a quality information rapid feedback system and a standard parts management system.

● Providecomplete supportat every step of your project, You will rely on a solid experienced partner that will be able to adapt to every situation and to help you take on all challenges that are part of any hydroelectric project. We dedicated to helpunleashing your potential and generate more power with our customized solutions!

Reliable, Easy to work with, Knowledgeable and we add value, though we are not perfect, but we are learning and improving, we love what we do, we appreciate all the valuable customer to give us a chance to know and see if we are the Mr. RIGHT for each other. Right here waiting for YOU to start a rewarding journey together!

 

FAQ

Are you trading company or manufacturer ? Is OEM service available?

A: We are a factory with more than 20 years of successful hydro turbine manufacturing experience, OEM service is available.

 

How long is your delivery time?

A: Generally it is 120-270 working days upon contract signing and receipt of prepayment.

 

What parameters are needed for the turbine generator quotation?

A: Normally we need rated water head, rated flow, rated installed capacity,voltage, frequency and rotation speed. The more information the better.

 

Do you offer water turbine installation service?

A: Yes. Installation service is available upon request.

 

What kinds of test and inspection is carried out to ensure product quality?

A: Mechanical property, chemical composition, hardness, surface roughness, Dimension check, profile check, NDT Testing ( UT/MT/RT/PT), balancing, pressure test ect, is strictly carried out according to relevant international standards.

 

What is the standard packing and transportation means?

Product will be packed in solid and safe sea-worthy cases, the properly packaged and marked product could be delivered to any port or site as specified in the Contract by ship, plane or truck.

 

What is the standard payment terms ?

Usually we accept T/T and L/C.

 

What kinds of guarantee provided?

Product warranty for 12 months after commissioning on site or 18 month after delivery whichever come first; We offer lifelong follow-up services for our products, and we will response to client requirements within 24 working hours.

If there is any other questions, pleaseemailme(oversea@gthec.cn) orchatwithmeonWhatsapp / Wechat / Mobile phone: +86 135 5586 1247

Related Products
  • wechat

    Getai: +86 135 5586 1247

Chat with Us