Francis turbines are built in a compact structure, with high efficiency, and can be applied to a wide range of water heads. This feature makes the Francis turbine type a widely used one around the world. The key Francis turbine components includes Runner, Distributor, Main shaft, Main shaft seal, Turbine guide bearing, Governor, among other.
About Getai Hydropower
We are a leading and professional turbine manufacturer of China. Our main products include quality hydroturbine and relevant accessories, including Pelton turbine runner, Francis turbine runner, Kaplan turbine runner, distributor, guide vane, blade, nozzle pipe, spiral case, conical pipe, elbow pipe, etc. for hydroturbine.
We made the first integrally-forged CNC-machining Pelton turbine runner in China in 2009, and the first integrally-forged CNC-machining Francis turbine runner in China in 2017.
Now our products are popular in more than 30 provinces in China and 20 countries all over the world, including the USA and Canada in North America; Japan, India, Pakistan, Viet Nam, Laos, Nepal in Asia; Serbia, Slovenia in Europe; Peru, Chile, Brazil in South America; Congo Kinshasa in Africa; Australia, Papua New Guinea in Oceania.
About Francis Runner Manufactured by Getai Hydropower
We are able to manufacture both cast and forged steel CNC machining Francis runner in the diamter of 0.5-4mm and in the output of 0.3-300MW. We can also manufacture the mono-block forged Francis runners.
We are also able to perform the Francis runner repair and renovation project through repair welding. The repaired products can also reach high value of performance, and can save the costs for the clients.
In addition to the Francis runners, we are also able to manufacture cast CNC-machining guide vanes and blades for Francis turbine.
Our products are highly efficient, cavitation and wear resistant and coated with HVOF, and therefore have high performance, which can help the power station to bring more economic profits.
Application Scope:
Application: | Francis Water Turbine Generator Unit |
Water head: | 20 ~ 700m |
Output: | 0.01 ~ 1000MW |
Frequency: | 50/60HZ |
Runner diameter: | 0.5 ~ 10m |
Life Span | 30-50 years |
All raw material strictly conform to international standard, key component such as runners, guide vane is Forged and entire CNC machined.
Chemical Composition for ASTM A473 S41500 and ASTM A743 CA6NM(%)
ASTM A473 S41500 | ≤0.05 | ≤0.60 | 0.5-1.0 | ≤0.030 | ≤0.030 | 11.5-14.0 | 3.5-5.5 | 0.40-0.80 |
ASTM A743 CA6NM | ≤0.06 | Max1.0 | Max1.0 | ≤0.040 | ≤0.030 | 11.5-14.0 | 3.5-4.5 | 0.40-1.0 |
Mechanical Property for ASTM A473 S41500 and ASTM A743 CA6NM
Material No. | σ0.2(Mpa) | σb(Mpa) | δ5(%) | ψ(%) | Akv (J/cm2) | HB |
ASTM A473 S41500 | ≥620 | ≥795 | ≥15 | ≥45 | ≥50 | ≤295 |
ASTM A743 CA6NM | ≥550 | ≥755 | ≥15 | ≥35 | ≥50 | ≤285 |
4. State of the art machining and testing equipment, as well as licensed professional engineers all combined to help guarantee better product precisioness.
5. All product is subject to strict inspection according to international standards and client special requirements.
7. Each project will strictly follow manufacturying plan to ensure the delivery date.
Problems and Renovation Requirements of Huangtankou Hydropower Station:
Max. Head |
Hmax=31m |
Rated Head |
Hr=28m |
Min. Head |
Hmin=24m |
Rated Flow |
Q=104.8cms |
Rated Output |
Pe=26800KW |
Rated Speed |
n=115.4 rpm |
Max. Runaway Speed |
np=242 rpm |
Suction Height |
Hs=+2m |
Runner Diameter |
D1=3800mm |
Blade Number |
14 |
Guide Vane Number |
Z0=24 |
Runner Type |
HL820-LJ-380 |
The main problem of the power station is insufficiency of output; the designed rated output of unit is 26MW (26.8MW if generator’s efficiency is calculated by 97%), but the output could only reach 24MW when all units are in full operation, since the installation.
According to the requirements of renovation, the output shall be greater than 26MW when all units are in full operation, and allowance shall be reserved for the good stability after unit renovation.
After renovation by Shenyang Getai:
After the renovation, the output and efficiency of the unit completely meet the requirements of the contract, with extra power generating ability of more than 30MW.
The new runner has high efficiency in the area of big flow and high load, and it operates stably in the high-load area, which could meet the requirements of customer for long-term stable operation of the runner in the full load area.
Strictly control the quality of runner casting, and provide testing block cut from the same castings in each furnace to the third party for strict inspection and test; strict NDT and overall annealing treatment for the welding work, to remove residual stress.
Generally speaking, this renovation project has achieved the purpose to upgrade the efficiency and capacity of the unit. The rated output of the new unit has reached 28MW (higher than 27MW estimated in the feasibility study report). The new unit has a good economic performance, so it may reduce the time to recover the cost.
Power Station Outdoor Scene