Shenyang Getai Hydropower Equipment Co., Ltd.
Pelton Turbine Generator
  • Pelton Turbine Generator
  • Pelton Turbine Generator
  • Pelton Turbine Generator
  • Pelton Turbine Generator
Pelton Turbine GeneratorPelton Turbine GeneratorPelton Turbine GeneratorPelton Turbine Generator

Pelton Turbine Generator

The water wheel generator is suitable for medium and high water head power plants. The key components are Pelton runner, main shaft, and Nozzle assembly.


Application Scope: Alcance de aplicación:


Water Head: 100 ~ 1700m
Output: 0.1 ~ 300MW
Frequency: 50/60HZ
Runner Diameter: 0.5 ~ 3m
Lift Span30-50 years

  


Share


    Water Turbine Generator

    Introduction of the Pelton Water Wheel Generator

    Hydro water wheel generator, also known as waterwheel generator, is a type of generator set that uses the rotation of the turbine to drive the generator rotor to generate electricity. Pelton turbine generator usually use different types of turbines and different types of generators to form a hydroelectric generator set, and the principle of hydroelectric generator power generation is to connect bearings to the rotor of the generator through the moving wheels in the hydraulic turbine, and then reuse water The potential energy washed down from the high to the low turbine is converted into kinetic energy to drive the rotor on the rotor and generator bearing to rotate, and the coil on the rotor rotates between the two poles of the magnet. When the coil rotates, the magnetic field of the coil on the rotor and the magnet on the stator changes to work tangentially. Therefore, the induced current is generated by the principle of "electromagnetic induction". The work done by the power is converted into electric energy by the magnetic field in the tangential direction Production device.

    Structure of the Water Wheel Turbine

    1. Advanced CFD, the FEA technic is utilized in the designing process to ensure a better technical solution.


    CFD analysis for a water wheel generator is performed in order to predict the turbine performance. The head loss in the collecting pipe and injector assembly is calculated based on CFD analysis results.


    The relation of needle stroke and flow also can be calculated. CFD analysis can improve injector and nozzle design to reduce head, Los. The flow curve relative to needle stroke can be drawn based on analytical data.


    Water Turbine Generator

    Velocity distribution in collecting pipe and injector assembly

    Water Turbine Generator

    Flow inside the nozzle and before bucket


    CFD analysis can simulate the whole procedure which flows coming into and outgoing from the bucket. The flow visualization can clearly show whether water flow outgoing from the bucket pressure side hit the bucket backside. Such a flow situation will cause more hydraulic loss and should be avoided during the runner bucket optimum design process. The torque generated by runner and pressure distribution in the bucket can be calculated based on CFD analysis results. Water wheel generator output and efficiency are finally predicted for various operating points.


    Water Turbine Generator


    Flow inside bucket

    The possible location of cavitation can be predicted based on the pressure distribution in the bucket. The phenomena of cavitation should be avoided in the back tip of splitter by optimum design for the back shape of the splitter. 


    Water Turbine Generator


    Fig.9 Prediction for cavitation location


    The pressure distribution in the bucket will be used for fatigue analysis of Pelton runner. The stress level for a bucket is calculated by using FEA analysis for a various load.


    Water Turbine Generator


    2. CAE casting simulation is adopted for the production of casting parts, this advanced and reliable process plan could help effectively improve product quality.


    Water Turbine Generator


    3. All raw materials strictly conform to international standards, such as ASTM, IEC, ISO, etc. key components such as runners, guide vane is Forged and entire CNC machined.


    Chemical Composition for ASTM A473 S41500 and ASTM A743 CA6NM(%)


    Material No.

    C

    Si

    Mn

    P

    S

    Cr

    Ni

    Mo

    ASTM A473 S41500

    ≤0.05

    ≤0.60

    0.5-1.0

    ≤0.030

    ≤0.030

    11.5-14.0

    3.5-5.5

    0.40-0.80

    ASTM A743 CA6NM

    ≤0.06

    Max1.0

    Max1.0

    ≤0.040

    ≤0.030

    11.5-14.0

    3.5-4.5

    0.40-1.0

    Mechanical Property for ASTM A473 S41500 and ASTM A743 CA6NM

    ASTM A473 S41500

    ≥620

    ≥795

    ≥15

    ≥45

    ≥50

    ≤295

    ASTM A743 CA6NM

    ≥550

    ≥755

    ≥15

    ≥35

    ≥50

    ≤285

     

    4. State of the art machining and testing equipment, as well as licensed professional engineers all combined to help guarantee better product precision.


     5. All product is subject to strict inspection according to international standards and client special requirements.


    Pelton Turbine Generator

    RT

    Pelton Turbine Generator

    MT



    Pelton Turbine Generator

     PT

    Pelton Turbine Generator

    Dynamic Balance


    Pelton Turbine Generator


    Profile Checking


    6. With the help of 3D Assembling, through motion simulation, the entire organization interaction can be seen at a glance. This helped a great deal for parts processing and pre-installation.


    Pelton Turbine Generator                            Pelton Turbine Generator


    7. Each project will strictly follow the manufacturing plan to ensure the delivery date. 

    Pelton Turbine Generator

    Our factory supplies GETAI water wheel generator, welcome your visit at any time.

    We could produce product according to inerntational standard and special client requirements. The standard we use include but not limited to the following:

    IEC Standard fro equipment and testing

    ASTM Standards

    CCH70-3 Specification for inspection of steel castings fro hydraulic machines

    EN (UNI-DIN) Standards

    JIS Standards

    ISO 1940-1-2003 Mechanical vibration-Balance quality requirements for rotors in a constant (rigid) state

    ASME-Bioler and Pressure Vessel Code

    - Section II - Material Specifications Part A-Ferrous

    - Section VIII - Pressure Vessels-Division 1

    - Section IX - Welding and Brazing Qualifications

    We dedicated to develop the best products and solutions for you in our role as specialists, to help unleashinging your potential and generate more power with our customized solutions!

    Hydro Power Plant assessment

    Inspections and offer customized solution

    Plant Maintenance

    Offer Spare parts

    Troubleshooting

    Consulting, installation guidance, site testing ect. field services

    Training

    More than 20 years of successful hydro turbines design,production and exporting experience, Long time certified suppliers for world renowned companies such as: MITSUBISHIHITACHI POWER SYSTEMS, LTD.(MHPS), Toshiba, GE, BHEL, ALSTOM, DEC,HEC, CHD ect.

    Continuous investment in both state-of-the-art facilities and R&D support us to be strong and powerful in the market, high performance versus price ratio product , we could help achieving your goals within budget and time frame.No cheating, No excuse, No purposed delay is what we always try to guarantee our partners!

    We got many national patents for our products, and all products conform to EU, ASTM, ISO, IEC, JIS etc. international standards.

    Quick and professional response to your request for drawings, quotations, and answers about any technical problems. We do our best to realize our commitment to you that: what you see and hear is what you will get, whatever customer you are, big or small. In the mean time, we implement a quality information rapid feedback system and a standard parts management system.

    Provide complete support at every step of your project, You will rely on a solid experienced partner that will be able to adapt to every situation and to help you take on all challenges that are part of any hydroelectric project. We dedicated to help unleashing your potential and generate more power with our customized solutions!

    Reliable, Easy to work with, Knowledgeable and we add value, though we are not perfect, but we are learning and improving, we love what we do, we appreciate all the valuable customer to give us a chance to know and see if we are the Mr. RIGHT for each other. Right here waiting for YOU to start a rewarding journey together!

    Are you trading company or manufacturer ? Is OEM service available?

    A: We are a factory with more than 20 years of successful hydro turbine manufacturing experience, OEM service is available.

    How long is your delivery time?

    A: Generally it is 120-270 working days upon contract signing and receipt of prepayment.

    What parameters are needed for the turbine generator quotation?

    A: Normally we need rated water head, rated flow, rated installed capacity,voltage, frequency and rotation speed. The more information the better.

    Do you offer water turbine installation service?

    A: Yes. Installation service is available upon request.

    What kinds of test and inspection is carried out to ensure product quality?

    A: Mechanical property, chemical composition, hardness, surface roughness, Dimension check, profile check, NDT Testing ( UT/MT/RT/PT), balancing, pressure test ect, is strictly carried out according to relevant international standards.

    What is the standard packing and transportation means?

    Product will be packed in solid and safe sea-worthy cases, the properly packaged and marked product could be delivered to any port or site as specified in the Contract by ship, plane or truck.

    What is the standard payment terms ?

    Usually we accept T/T and L/C.

    What kinds of guarantee provided?

    Product warranty for 12 months after commissioning on site or 18 month after delivery whichever come first; We offer lifelong follow-up services for our products, and we will response to client requirements within 24 working hours.

    If there is any other questions, please email me (oversea@gthec.cn) or chat with me on Whatsapp/Wechat /Mobilephone: +86 135 5586 1247

Description


Water Turbine Generator

Introduction of the Pelton Water Wheel Generator

Hydro water wheel generator, also known as waterwheel generator, is a type of generator set that uses the rotation of the turbine to drive the generator rotor to generate electricity. Pelton turbine generator usually use different types of turbines and different types of generators to form a hydroelectric generator set, and the principle of hydroelectric generator power generation is to connect bearings to the rotor of the generator through the moving wheels in the hydraulic turbine, and then reuse water The potential energy washed down from the high to the low turbine is converted into kinetic energy to drive the rotor on the rotor and generator bearing to rotate, and the coil on the rotor rotates between the two poles of the magnet. When the coil rotates, the magnetic field of the coil on the rotor and the magnet on the stator changes to work tangentially. Therefore, the induced current is generated by the principle of "electromagnetic induction". The work done by the power is converted into electric energy by the magnetic field in the tangential direction Production device.

Structure of the Water Wheel Turbine

1. Advanced CFD, the FEA technic is utilized in the designing process to ensure a better technical solution.


CFD analysis for a water wheel generator is performed in order to predict the turbine performance. The head loss in the collecting pipe and injector assembly is calculated based on CFD analysis results.


The relation of needle stroke and flow also can be calculated. CFD analysis can improve injector and nozzle design to reduce head, Los. The flow curve relative to needle stroke can be drawn based on analytical data.


Water Turbine Generator

Velocity distribution in collecting pipe and injector assembly

Water Turbine Generator

Flow inside the nozzle and before bucket


CFD analysis can simulate the whole procedure which flows coming into and outgoing from the bucket. The flow visualization can clearly show whether water flow outgoing from the bucket pressure side hit the bucket backside. Such a flow situation will cause more hydraulic loss and should be avoided during the runner bucket optimum design process. The torque generated by runner and pressure distribution in the bucket can be calculated based on CFD analysis results. Water wheel generator output and efficiency are finally predicted for various operating points.


Water Turbine Generator


Flow inside bucket

The possible location of cavitation can be predicted based on the pressure distribution in the bucket. The phenomena of cavitation should be avoided in the back tip of splitter by optimum design for the back shape of the splitter. 


Water Turbine Generator


Fig.9 Prediction for cavitation location


The pressure distribution in the bucket will be used for fatigue analysis of Pelton runner. The stress level for a bucket is calculated by using FEA analysis for a various load.


Water Turbine Generator


2. CAE casting simulation is adopted for the production of casting parts, this advanced and reliable process plan could help effectively improve product quality.


Water Turbine Generator


3. All raw materials strictly conform to international standards, such as ASTM, IEC, ISO, etc. key components such as runners, guide vane is Forged and entire CNC machined.


Chemical Composition for ASTM A473 S41500 and ASTM A743 CA6NM(%)


Material No.

C

Si

Mn

P

S

Cr

Ni

Mo

ASTM A473 S41500

≤0.05

≤0.60

0.5-1.0

≤0.030

≤0.030

11.5-14.0

3.5-5.5

0.40-0.80

ASTM A743 CA6NM

≤0.06

Max1.0

Max1.0

≤0.040

≤0.030

11.5-14.0

3.5-4.5

0.40-1.0

Mechanical Property for ASTM A473 S41500 and ASTM A743 CA6NM

ASTM A473 S41500

≥620

≥795

≥15

≥45

≥50

≤295

ASTM A743 CA6NM

≥550

≥755

≥15

≥35

≥50

≤285

 

4. State of the art machining and testing equipment, as well as licensed professional engineers all combined to help guarantee better product precision.


 5. All product is subject to strict inspection according to international standards and client special requirements.


Pelton Turbine Generator

RT

Pelton Turbine Generator

MT



Pelton Turbine Generator

 PT

Pelton Turbine Generator

Dynamic Balance


Pelton Turbine Generator


Profile Checking


6. With the help of 3D Assembling, through motion simulation, the entire organization interaction can be seen at a glance. This helped a great deal for parts processing and pre-installation.


Pelton Turbine Generator                            Pelton Turbine Generator


7. Each project will strictly follow the manufacturing plan to ensure the delivery date. 

Pelton Turbine Generator

Our factory supplies GETAI water wheel generator, welcome your visit at any time.

Applicable Standard

We could produce product according to inerntational standard and special client requirements. The standard we use include but not limited to the following:

IEC Standard fro equipment and testing

ASTM Standards

CCH70-3 Specification for inspection of steel castings fro hydraulic machines

EN (UNI-DIN) Standards

JIS Standards

ISO 1940-1-2003 Mechanical vibration-Balance quality requirements for rotors in a constant (rigid) state

ASME-Bioler and Pressure Vessel Code

- Section II - Material Specifications Part A-Ferrous

- Section VIII - Pressure Vessels-Division 1

- Section IX - Welding and Brazing Qualifications

Service

We dedicated to develop the best products and solutions for you in our role as specialists, to help unleashinging your potential and generate more power with our customized solutions!

Hydro Power Plant assessment

Inspections and offer customized solution

Plant Maintenance

Offer Spare parts

Troubleshooting

Consulting, installation guidance, site testing ect. field services

Training

Why Choose Us

More than 20 years of successful hydro turbines design,production and exporting experience, Long time certified suppliers for world renowned companies such as: MITSUBISHIHITACHI POWER SYSTEMS, LTD.(MHPS), Toshiba, GE, BHEL, ALSTOM, DEC,HEC, CHD ect.

Continuous investment in both state-of-the-art facilities and R&D support us to be strong and powerful in the market, high performance versus price ratio product , we could help achieving your goals within budget and time frame.No cheating, No excuse, No purposed delay is what we always try to guarantee our partners!

We got many national patents for our products, and all products conform to EU, ASTM, ISO, IEC, JIS etc. international standards.

Quick and professional response to your request for drawings, quotations, and answers about any technical problems. We do our best to realize our commitment to you that: what you see and hear is what you will get, whatever customer you are, big or small. In the mean time, we implement a quality information rapid feedback system and a standard parts management system.

Provide complete support at every step of your project, You will rely on a solid experienced partner that will be able to adapt to every situation and to help you take on all challenges that are part of any hydroelectric project. We dedicated to help unleashing your potential and generate more power with our customized solutions!

Reliable, Easy to work with, Knowledgeable and we add value, though we are not perfect, but we are learning and improving, we love what we do, we appreciate all the valuable customer to give us a chance to know and see if we are the Mr. RIGHT for each other. Right here waiting for YOU to start a rewarding journey together!

FAQ

Are you trading company or manufacturer ? Is OEM service available?

A: We are a factory with more than 20 years of successful hydro turbine manufacturing experience, OEM service is available.

How long is your delivery time?

A: Generally it is 120-270 working days upon contract signing and receipt of prepayment.

What parameters are needed for the turbine generator quotation?

A: Normally we need rated water head, rated flow, rated installed capacity,voltage, frequency and rotation speed. The more information the better.

Do you offer water turbine installation service?

A: Yes. Installation service is available upon request.

What kinds of test and inspection is carried out to ensure product quality?

A: Mechanical property, chemical composition, hardness, surface roughness, Dimension check, profile check, NDT Testing ( UT/MT/RT/PT), balancing, pressure test ect, is strictly carried out according to relevant international standards.

What is the standard packing and transportation means?

Product will be packed in solid and safe sea-worthy cases, the properly packaged and marked product could be delivered to any port or site as specified in the Contract by ship, plane or truck.

What is the standard payment terms ?

Usually we accept T/T and L/C.

What kinds of guarantee provided?

Product warranty for 12 months after commissioning on site or 18 month after delivery whichever come first; We offer lifelong follow-up services for our products, and we will response to client requirements within 24 working hours.

If there is any other questions, please email me (oversea@gthec.cn) or chat with me on Whatsapp/Wechat /Mobilephone: +86 135 5586 1247

Copyright © Shenyang Getai Hydropower Equipment Co., Ltd. All Rights Reserved | Sitemap | Powered by 辽ICP备09000289号

WeChat

Whatsapp

Skype

E-mail