CN
ES
EN
oversea@gthec.cn
Home
About Us
Company Introduction
History
Culture & Careers
Certificates
Partners
Download
Products
Pelton Turbine
Francis Turbine
Kaplan & Tubular Turbine
Others
Reference List
Technical Capacity
R&D Capability
Hydraulic Optimization Design (CFD)
Structure Design (FEA)
Mechanism Design (3D Assembling)
Process Optimization (CAE Casting Simulation)
Manufacturing
Casting & Forging
Machining
Welding & Assembly
Testing
Quality & Safety
News
Company News
Industry News
Product News
HPP Rehabilitation
Pelton Turbine
Kaplan &Tubular Turbine
Francis Turbine
Others
Contact Us
Home
About Us
Company Introduction
History
Culture & Careers
Certificates
Partners
Download
Products
Pelton Turbine
Francis Turbine
Kaplan & Tubular Turbine
Others
Reference List
Technical Capacity
R&D Capability
Hydraulic Optimization Design (CFD)
Structure Design (FEA)
Mechanism Design (3D Assembling)
Process Optimization (CAE Casting Simulation)
Manufacturing
Casting & Forging
Machining
Welding & Assembly
Testing
Quality & Safety
News
Company News
Industry News
Product News
HPP Rehabilitation
Pelton Turbine
Kaplan &Tubular Turbine
Francis Turbine
Others
Contact Us
Home
/
HPP Rehabilitation
/
Pelton Turbine
Pelton Turbine Rehabilitation of Sichuan Tie Changhe power plant
May. 08, 2018
Problem: The operating head of the power station is high (the maximum operating water head is 1037m). The runner bucket had been broken many times, and the unit shuts down frequently, causing serious damages to other components of the tu...
Pelton Turbine Rehabilitation of Yunan Ci Zhonghe Hydropower Station
May. 08, 2018
Problem: The installed capacity of the power station is 2 x 12MW. After one year operation, cracks occurred in many buckets. One of the turbine runners lost their bucket and needs to be frequently shut down to repair it. The power st...
Pelton turbine rehabilitation of Hubei Suo Jinshan Power Station
May. 08, 2018
Problem: The equipment bucket runner was broken, it had many penetration cracks. The unit consumed a large amount of water and the output was low. The leaking oil from the nozzle leads to mix oil and water. The mechanical feedback devi...
Pelton Turbine Rehabilitation of Papua New Guinea Power Plant
May. 07, 2018
Problem: The original turbine had already operated for one hundred years. When the flood season came, the turbine bucket falling phenomenon happened frequently and the turbine couldn’t reach the rated output and the noise was too loud. ...
New Pelton Turbine of Ren Pinghe II Hydropower station
May. 07, 2018
New Pelton Turbine of Ren Pinghe II Hydropower station
Previous
1
2
Next
Hot Products
Pelton Wheel Turbine
Francis Turbine Generator
Kaplan & Tubular Turbine
Francis turbine
Pelton Turbine Generator
Copyright © Shenyang Getai Hydropower Equipment Co., Ltd. All Rights Reserved |
Sitemap
| Powered by
辽ICP备09000289号
WeChat
Whatsapp
Skype
E-mail