CN
ES
EN
oversea@gthec.cn
Home
About Us
Company Introduction
History
Culture & Careers
Certificates
Partners
Download
Products
Pelton Turbine
Francis Turbine
Kaplan & Tubular Turbine
Others
Reference List
Technical Capacity
R&D Capability
Hydraulic Optimization Design (CFD)
Structure Design (FEA)
Mechanism Design (3D Assembling)
Process Optimization (CAE Casting Simulation)
Manufacturing
Casting & Forging
Machining
Welding & Assembly
Testing
Quality & Safety
News
Company News
Industry News
Product News
HPP Rehabilitation
Pelton Turbine
Kaplan &Tubular Turbine
Francis Turbine
Others
Contact Us
Home
About Us
Company Introduction
History
Culture & Careers
Certificates
Partners
Download
Products
Pelton Turbine
Francis Turbine
Kaplan & Tubular Turbine
Others
Reference List
Technical Capacity
R&D Capability
Hydraulic Optimization Design (CFD)
Structure Design (FEA)
Mechanism Design (3D Assembling)
Process Optimization (CAE Casting Simulation)
Manufacturing
Casting & Forging
Machining
Welding & Assembly
Testing
Quality & Safety
News
Company News
Industry News
Product News
HPP Rehabilitation
Pelton Turbine
Kaplan &Tubular Turbine
Francis Turbine
Others
Contact Us
Home
/
HPP Rehabilitation
/
Kaplan &Tubular Turbine
Kaplan Turbine Rehabilitation of Serbia Sokolovica Power Station (in processing)
May. 08, 2018
Problem: The Kaplan turbine with rotatory blade was built in 1948. The original unit structure was complex and the maintenance tusks were complicated. There was oil leakage in the hub, causing a frequent downstream oil contamination an...
Hot Products
Pelton Wheel Turbine
Francis Turbine Generator
Kaplan & Tubular Turbine
Francis turbine
Pelton Turbine Generator
Copyright © Shenyang Getai Hydropower Equipment Co., Ltd. All Rights Reserved |
Sitemap
| Powered by
辽ICP备09000289号
WeChat
Whatsapp
Skype
E-mail