Shenyang Getai Hydropower Equipment Co., Ltd.
Francis Turbine Generator
  • Francis Turbine Generator
  • Francis Turbine Generator
  • Francis Turbine Generator
  • Francis Turbine Generator
Francis Turbine GeneratorFrancis Turbine GeneratorFrancis Turbine GeneratorFrancis Turbine Generator

Francis Turbine Generator

Francis turbines are built in a compact structure, with high efficiency, and can be applied to a wide range of water heads. This feature makes the Francis turbine type a widely used one around the world. The key Francis turbine components includes Runner, Distributor, Main shaft, Main shaft seal, Turbine guide bearing, Governor, among other.

Application Scope:

Application:Francis Water Turbine Generator Unit
Water head: 20 ~ 700m
Output:0.01 ~ 1000MW
Frequency: 50/60HZ
Runner diameter:0.5 ~ 10m
Life Span30-50 years


Share

    Francis Turbine Generator Introduction


    1. Advanced CFD, FEA technic is utilized in the designing process to ensure better technical solution.

    2. CAE casting simulation is adopted for the produciton of casting parts, this advanced and reliable process plan could help effectively improve product quality.

    Francis Turbine Generator Components

    3. All raw material strictly conform to international standard, key component such as runners, guide vane is Forged and entire CNC machined.


    Chemical Composition for ASTM A473 S41500 and ASTM A743 CA6NM(%)


    ASTM A473 S41500≤0.05≤0.600.5-1.0≤0.030≤0.03011.5-14.03.5-5.50.40-0.80
    ASTM A743 CA6NM≤0.06Max1.0Max1.0≤0.040≤0.03011.5-14.03.5-4.50.40-1.0

     Mechanical Property for ASTM A473 S41500 and ASTM A743 CA6NM

    Material No.σ0.2(Mpa)σb(Mpa)δ5(%)ψ(%)Akv (J/cm2)HB
    ASTM A473 S41500≥620≥795≥15≥45≥50≤295
    ASTM A743 CA6NM≥550≥755≥15≥35≥50≤285


    4. State of the art machining and testing equipment, as well as licensed professional engineers all combined to help guarantee better product precisioness.

    5. All product is subject to strict inspection according to international standards and client special requirements.

    Francis Turbine GeneratorFrancis Turbine Generator for sale

    Francis Turbine GeneratorFrancis Turbine Generator

    Francis Turbine GeneratorFrancis Turbine Generator

    6. With the help of 3D Assembling, through motion simulation, the entire organization interaction can be seen at a glance. This helped a great deal for parts processing and pre-installation.

    GETAI Francis Turbine Generator

    7. Each project will strictly follow manufacturying plan to ensure the delivery date.

    Francis Turbine Generator


    Renovation Project of Huangtankou Hydropower Station


    Problems and Renovation Requirements of Huangtankou Hydropower Station:

    Max. Head

    Hmax=31m

    Rated Head

    Hr=28m

    Min. Head

    Hmin=24m

    Rated Flow

    Q=104.8cms

    Rated Output

    Pe=26800KW

    Rated Speed

    n=115.4 rpm

    Max. Runaway Speed

    np=242 rpm

    Suction Height

    Hs=+2m

    Runner Diameter

    D1=3800mm

    Blade Number

    14

    Guide Vane Number

    Z0=24

    Runner Type

    HL820-LJ-380


    • The main problem of the power station is insufficiency of output; the designed rated output of unit is 26MW (26.8MW if generator’s efficiency is calculated by 97%), but the output could only reach 24MW when all units are in full operation, since the installation.

    • According to the requirements of renovation, the output shall be greater than 26MW when all units are in full operation, and allowance shall be reserved for the good stability after unit renovation.


    After renovation by Shenyang Getai:

    • After the renovation, the output and efficiency of the unit completely meet the requirements of the contract, with extra power generating ability of more than 30MW.

    • The new runner has high efficiency in the area of big flow and high load, and it operates stably in the high-load area, which could meet the requirements of customer for long-term stable operation of the runner in the full load area.

    • Strictly control the quality of runner casting, and provide testing block cut from the same castings in each furnace to the third party for strict inspection and test; strict NDT and overall annealing treatment for the welding work, to remove residual stress.

    • Generally speaking, this renovation project has achieved the purpose to upgrade the efficiency and capacity of the unit. The rated output of the new unit has reached 28MW (higher than 27MW estimated in the feasibility study report). The new unit has a good economic performance, so it may reduce the time to recover the cost.


    Francis Turbine Generator

    Power Station Outdoor Scene

    We could produce product according to inerntational standard and special client requirements. The standard we use include but not limited to the following:

    IEC Standard fro equipment and testing

    ASTM Standards

    CCH70-3 Specification for inspection of steel castings fro hydraulic machines

    EN (UNI-DIN) Standards

    JIS Standards

    ISO 1940-1-2003 Mechanical vibration-Balance quality requirements for rotors in a constant (rigid) state

    ASME-Bioler and Pressure Vessel Code

    - Section II - Material Specifications Part A-Ferrous

    - Section VIII - Pressure Vessels-Division 1

    - Section IX - Welding and Brazing Qualifications

    We dedicated to develop the best products and solutions for you in our role as specialists, to help unleashinging your potential and generate more power with our customized solutions!

    Hydro Power Plant assessment

    Inspections and offer customized solution

    Plant Maintenance

    Offer Spare parts

    Troubleshooting

    Consulting, installation guidance, site testing ect. field services

    Training

    More than 20 years of successful hydro turbines design,production and exporting experience, Long time certified suppliers for world renowned companies such as: MITSUBISHIHITACHI POWER SYSTEMS, LTD.(MHPS), Toshiba, GE, BHEL, ALSTOM, DEC,HEC, CHD ect.

    Continuous investment in both state-of-the-art facilities and R&D support us to be strong and powerful in the market, high performance versus price ratio product , we could help achieving your goals within budget and time frame.No cheating, No excuse, No purposed delay is what we always try to guarantee our partners!

    We got many national patents for our products, and all products conform to EU, ASTM, ISO, IEC, JIS etc. international standards.

    Quick and professional response to your request for drawings, quotations, and answers about any technical problems. We do our best to realize our commitment to you that: what you see and hear is what you will get, whatever customer you are, big or small. In the mean time, we implement a quality information rapid feedback system and a standard parts management system.

    Provide complete support at every step of your project, You will rely on a solid experienced partner that will be able to adapt to every situation and to help you take on all challenges that are part of any hydroelectric project. We dedicated to help unleashing your potential and generate more power with our customized solutions!

    Reliable, Easy to work with, Knowledgeable and we add value, though we are not perfect, but we are learning and improving, we love what we do, we appreciate all the valuable customer to give us a chance to know and see if we are the Mr. RIGHT for each other. Right here waiting for YOU to start a rewarding journey together!

    Are you trading company or manufacturer ? Is OEM service available?

    A: We are a factory with more than 20 years of successful hydro turbine manufacturing experience, OEM service is available.

    How long is your delivery time?

    A: Generally it is 120-270 working days upon contract signing and receipt of prepayment.

    What parameters are needed for the turbine generator quotation?

    A: Normally we need rated water head, rated flow, rated installed capacity,voltage, frequency and rotation speed. The more information the better.

    Do you offer water turbine installation service?

    A: Yes. Installation service is available upon request.

    What kinds of test and inspection is carried out to ensure product quality?

    A: Mechanical property, chemical composition, hardness, surface roughness, Dimension check, profile check, NDT Testing ( UT/MT/RT/PT), balancing, pressure test ect, is strictly carried out according to relevant international standards.

    What is the standard packing and transportation means?

    Product will be packed in solid and safe sea-worthy cases, the properly packaged and marked product could be delivered to any port or site as specified in the Contract by ship, plane or truck.

    What is the standard payment terms ?

    Usually we accept T/T and L/C.

    What kinds of guarantee provided?

    Product warranty for 12 months after commissioning on site or 18 month after delivery whichever come first; We offer lifelong follow-up services for our products, and we will response to client requirements within 24 working hours.

    If there is any other questions, please email me (oversea@gthec.cn) or chat with me on Whatsapp/Wechat /Mobilephone: +86 135 5586 1247

Description

Francis Turbine Generator Introduction


1. Advanced CFD, FEA technic is utilized in the designing process to ensure better technical solution.

2. CAE casting simulation is adopted for the produciton of casting parts, this advanced and reliable process plan could help effectively improve product quality.

Francis Turbine Generator Components

3. All raw material strictly conform to international standard, key component such as runners, guide vane is Forged and entire CNC machined.


Chemical Composition for ASTM A473 S41500 and ASTM A743 CA6NM(%)


ASTM A473 S41500≤0.05≤0.600.5-1.0≤0.030≤0.03011.5-14.03.5-5.50.40-0.80
ASTM A743 CA6NM≤0.06Max1.0Max1.0≤0.040≤0.03011.5-14.03.5-4.50.40-1.0

 Mechanical Property for ASTM A473 S41500 and ASTM A743 CA6NM

Material No.σ0.2(Mpa)σb(Mpa)δ5(%)ψ(%)Akv (J/cm2)HB
ASTM A473 S41500≥620≥795≥15≥45≥50≤295
ASTM A743 CA6NM≥550≥755≥15≥35≥50≤285


4. State of the art machining and testing equipment, as well as licensed professional engineers all combined to help guarantee better product precisioness.

5. All product is subject to strict inspection according to international standards and client special requirements.

Francis Turbine GeneratorFrancis Turbine Generator for sale

Francis Turbine GeneratorFrancis Turbine Generator

Francis Turbine GeneratorFrancis Turbine Generator

6. With the help of 3D Assembling, through motion simulation, the entire organization interaction can be seen at a glance. This helped a great deal for parts processing and pre-installation.

GETAI Francis Turbine Generator

7. Each project will strictly follow manufacturying plan to ensure the delivery date.

Francis Turbine Generator


Renovation Project of Huangtankou Hydropower Station


Problems and Renovation Requirements of Huangtankou Hydropower Station:

Max. Head

Hmax=31m

Rated Head

Hr=28m

Min. Head

Hmin=24m

Rated Flow

Q=104.8cms

Rated Output

Pe=26800KW

Rated Speed

n=115.4 rpm

Max. Runaway Speed

np=242 rpm

Suction Height

Hs=+2m

Runner Diameter

D1=3800mm

Blade Number

14

Guide Vane Number

Z0=24

Runner Type

HL820-LJ-380


  • The main problem of the power station is insufficiency of output; the designed rated output of unit is 26MW (26.8MW if generator’s efficiency is calculated by 97%), but the output could only reach 24MW when all units are in full operation, since the installation.

  • According to the requirements of renovation, the output shall be greater than 26MW when all units are in full operation, and allowance shall be reserved for the good stability after unit renovation.


After renovation by Shenyang Getai:

  • After the renovation, the output and efficiency of the unit completely meet the requirements of the contract, with extra power generating ability of more than 30MW.

  • The new runner has high efficiency in the area of big flow and high load, and it operates stably in the high-load area, which could meet the requirements of customer for long-term stable operation of the runner in the full load area.

  • Strictly control the quality of runner casting, and provide testing block cut from the same castings in each furnace to the third party for strict inspection and test; strict NDT and overall annealing treatment for the welding work, to remove residual stress.

  • Generally speaking, this renovation project has achieved the purpose to upgrade the efficiency and capacity of the unit. The rated output of the new unit has reached 28MW (higher than 27MW estimated in the feasibility study report). The new unit has a good economic performance, so it may reduce the time to recover the cost.


Francis Turbine Generator

Power Station Outdoor Scene

Applicable Standard

We could produce product according to inerntational standard and special client requirements. The standard we use include but not limited to the following:

IEC Standard fro equipment and testing

ASTM Standards

CCH70-3 Specification for inspection of steel castings fro hydraulic machines

EN (UNI-DIN) Standards

JIS Standards

ISO 1940-1-2003 Mechanical vibration-Balance quality requirements for rotors in a constant (rigid) state

ASME-Bioler and Pressure Vessel Code

- Section II - Material Specifications Part A-Ferrous

- Section VIII - Pressure Vessels-Division 1

- Section IX - Welding and Brazing Qualifications

Service

We dedicated to develop the best products and solutions for you in our role as specialists, to help unleashinging your potential and generate more power with our customized solutions!

Hydro Power Plant assessment

Inspections and offer customized solution

Plant Maintenance

Offer Spare parts

Troubleshooting

Consulting, installation guidance, site testing ect. field services

Training

Why Choose Us

More than 20 years of successful hydro turbines design,production and exporting experience, Long time certified suppliers for world renowned companies such as: MITSUBISHIHITACHI POWER SYSTEMS, LTD.(MHPS), Toshiba, GE, BHEL, ALSTOM, DEC,HEC, CHD ect.

Continuous investment in both state-of-the-art facilities and R&D support us to be strong and powerful in the market, high performance versus price ratio product , we could help achieving your goals within budget and time frame.No cheating, No excuse, No purposed delay is what we always try to guarantee our partners!

We got many national patents for our products, and all products conform to EU, ASTM, ISO, IEC, JIS etc. international standards.

Quick and professional response to your request for drawings, quotations, and answers about any technical problems. We do our best to realize our commitment to you that: what you see and hear is what you will get, whatever customer you are, big or small. In the mean time, we implement a quality information rapid feedback system and a standard parts management system.

Provide complete support at every step of your project, You will rely on a solid experienced partner that will be able to adapt to every situation and to help you take on all challenges that are part of any hydroelectric project. We dedicated to help unleashing your potential and generate more power with our customized solutions!

Reliable, Easy to work with, Knowledgeable and we add value, though we are not perfect, but we are learning and improving, we love what we do, we appreciate all the valuable customer to give us a chance to know and see if we are the Mr. RIGHT for each other. Right here waiting for YOU to start a rewarding journey together!

FAQ

Are you trading company or manufacturer ? Is OEM service available?

A: We are a factory with more than 20 years of successful hydro turbine manufacturing experience, OEM service is available.

How long is your delivery time?

A: Generally it is 120-270 working days upon contract signing and receipt of prepayment.

What parameters are needed for the turbine generator quotation?

A: Normally we need rated water head, rated flow, rated installed capacity,voltage, frequency and rotation speed. The more information the better.

Do you offer water turbine installation service?

A: Yes. Installation service is available upon request.

What kinds of test and inspection is carried out to ensure product quality?

A: Mechanical property, chemical composition, hardness, surface roughness, Dimension check, profile check, NDT Testing ( UT/MT/RT/PT), balancing, pressure test ect, is strictly carried out according to relevant international standards.

What is the standard packing and transportation means?

Product will be packed in solid and safe sea-worthy cases, the properly packaged and marked product could be delivered to any port or site as specified in the Contract by ship, plane or truck.

What is the standard payment terms ?

Usually we accept T/T and L/C.

What kinds of guarantee provided?

Product warranty for 12 months after commissioning on site or 18 month after delivery whichever come first; We offer lifelong follow-up services for our products, and we will response to client requirements within 24 working hours.

If there is any other questions, please email me (oversea@gthec.cn) or chat with me on Whatsapp/Wechat /Mobilephone: +86 135 5586 1247

Copyright © Shenyang Getai Hydropower Equipment Co., Ltd. All Rights Reserved | Sitemap | Powered by 辽ICP备09000289号

WeChat

Whatsapp

Skype

E-mail