On March 21, 2023, a group of Russian clients visited Getai Hydropower in Shenyang, China for the FAT inspections of the Francis Runner made for their power station. They participated and witnessed strict inspections and tests on the product, including dimension inspections, hardness tests, runner profile inspections, static balance test, etc., and felt very satisfied with the quality of the runner and our services. The cast Francis runner weighs 3265KG, with the diameter of 1.6m, and is manufactured with CNC machining.
The inspection takes two days. Now the runner has been packaged for delivery to the Russian power station.