Shenyang Getai Hydropower Equipment Co., Ltd.

Pelton turbine rehabilitation of Hubei Suo Jinshan Power Station

May. 08, 2018

Problem: The equipment bucket runner was broken, it had many penetration cracks. The unit consumed a large amount of water and the output was low. The leaking oil from the nozzle leads to mix oil and water. The mechanical feedback device jams and the unit frequently fails

New runner model: CJGT003-L-130/4×10,Nozzle: Straight flow oil control nozzle

Solution: The runner was built with ultra-low carbon refining steel casting technology and entire CNC machining. the output increased and efficiency improved. The first refurbished turbine runner have already been running for 5 years with no cracks. The oil and water mixing problem was solved by using the German double-output magnetostrictive displacement sensor to feedback the accurate stroke.

Pelton turbine rehabilitation of Hubei Suo Jinshan Power StationPelton turbine rehabilitation of Hubei Suo Jinshan Power StationPelton turbine rehabilitation of Hubei Suo Jinshan Power StationPelton turbine rehabilitation of Hubei Suo Jinshan Power StationPelton turbine rehabilitation of Hubei Suo Jinshan Power StationPelton turbine rehabilitation of Hubei Suo Jinshan Power Station

Copyright © Shenyang Getai Hydropower Equipment Co., Ltd. All Rights Reserved | Sitemap | Powered by 辽ICP备09000289号

WeChat

Whatsapp

Skype

E-mail