Shenyang Getai Hydropower Equipment Co., Ltd.
Double Francis Turbine
  • Double Francis Turbine
  • Double Francis Turbine
  • Double Francis Turbine
  • Double Francis Turbine
Double Francis TurbineDouble Francis TurbineDouble Francis TurbineDouble Francis Turbine

Double Francis Turbine

The key Double Francis turbine components includes Runner, Distributor, Main shaft, Main shaft seal, Turbine guide bearing, Governor, among other.

Application Scope:

Water Head:
Output:
Frequency:50/60HZ
Runner Diameter:
Lift Span30-50 years


Share

    Product Introduction

    1. Advanced CFD, FEA technic is utilized in the designing process to ensure better technical solution.

    Double Francis Turbine    Double Francis Turbine

    Double Francis Turbine    Double Francis Turbine

    Double Francis Turbine    Double Francis Turbine

    Double Francis Turbine    Double Francis Turbine


    2. CAE casting simulation is adopted for the produciton of casting parts, this advanced and reliable process plan could help effectively improve product quality.

    3. All raw material strictly conform to international standard, such as ASTM, IEC,ISO etc. key component such as runners, guide vane is Forged and entire CNC machined.

    Chemical Composition for ASTM A473 S41500 and ASTM A743 CA6NM(%)

    Material No.CSiMnPSCrNiMo
    ASTM A473 S41500≤0.05≤0.600.5-1.0≤0.030≤0.03011.5-14.03.5-5.50.40-0.80
    ASTM A743 CA6NM≤0.06Max1.0Max1.0≤0.040≤0.03011.5-14.03.5-4.50.40-1.0


    Mechanical Property for ASTM A473 S41500 and ASTM A743 CA6NM

    Material No.σ0.2(Mpa)σb(Mpa)δ5(%)ψ(%)Akv (J/cm2)HB
    ASTM A473 S41500≥620≥795≥15≥45≥50≤295
    ASTM A743 CA6NM≥550≥755≥15≥35≥50≤285


    4. State of the art machining and testing equipment, as well as licensed professional engineers all combined to help guarantee better product precisioness.

    5. All product is subject to strict inspection according to international standards and client special requirements.

    6. With the help of 3D Assembling, through motion simulation, the entire organization interaction can be seen at a glance. This helped a great deal for parts processing and pre-installation.

    Double Francis Turbine

    7. Each project will strictly follow manufacturying plan to ensure the delivery date.

    Double Francis Turbine

    8. ISO 9001 Quality Management system is carried out to ensure better management control

    Double Francis Turbine

    We could produce product according to inerntational standard and special client requirements. The standard we use include but not limited to the following:

    IEC Standard fro equipment and testing

    ASTM Standards

    CCH70-3 Specification for inspection of steel castings fro hydraulic machines

    EN (UNI-DIN) Standards

    JIS Standards

    ISO 1940-1-2003 Mechanical vibration-Balance quality requirements for rotors in a constant (rigid) state

    ASME-Bioler and Pressure Vessel Code

    - Section II - Material Specifications Part A-Ferrous

    - Section VIII - Pressure Vessels-Division 1

    - Section IX - Welding and Brazing Qualifications

    We dedicated to develop the best products and solutions for you in our role as specialists, to help unleashinging your potential and generate more power with our customized solutions!

    Hydro Power Plant assessment

    Inspections and offer customized solution

    Plant Maintenance

    Offer Spare parts

    Troubleshooting

    Consulting, installation guidance, site testing ect. field services

    Training

    More than 20 years of successful hydro turbines design,production and exporting experience, Long time certified suppliers for world renowned companies such as: MITSUBISHIHITACHI POWER SYSTEMS, LTD.(MHPS), Toshiba, GE, BHEL, ALSTOM, DEC,HEC, CHD ect.

    Continuous investment in both state-of-the-art facilities and R&D support us to be strong and powerful in the market, high performance versus price ratio product , we could help achieving your goals within budget and time frame.No cheating, No excuse, No purposed delay is what we always try to guarantee our partners!

    We got many national patents for our products, and all products conform to EU, ASTM, ISO, IEC, JIS etc. international standards.

    Quick and professional response to your request for drawings, quotations, and answers about any technical problems. We do our best to realize our commitment to you that: what you see and hear is what you will get, whatever customer you are, big or small. In the mean time, we implement a quality information rapid feedback system and a standard parts management system.

    Provide complete support at every step of your project, You will rely on a solid experienced partner that will be able to adapt to every situation and to help you take on all challenges that are part of any hydroelectric project. We dedicated to help unleashing your potential and generate more power with our customized solutions!

    Reliable, Easy to work with, Knowledgeable and we add value, though we are not perfect, but we are learning and improving, we love what we do, we appreciate all the valuable customer to give us a chance to know and see if we are the Mr. RIGHT for each other. Right here waiting for YOU to start a rewarding journey together!

    Are you trading company or manufacturer ? Is OEM service available?

    A: We are a factory with more than 20 years of successful hydro turbine manufacturing experience, OEM service is available.

    How long is your delivery time?

    A: Generally it is 120-270 working days upon contract signing and receipt of prepayment.

    What parameters are needed for the turbine generator quotation?

    A: Normally we need rated water head, rated flow, rated installed capacity,voltage, frequency and rotation speed. The more information the better.

    Do you offer water turbine installation service?

    A: Yes. Installation service is available upon request.

    What kinds of test and inspection is carried out to ensure product quality?

    A: Mechanical property, chemical composition, hardness, surface roughness, Dimension check, profile check, NDT Testing ( UT/MT/RT/PT), balancing, pressure test ect, is strictly carried out according to relevant international standards.

    What is the standard packing and transportation means?

    Product will be packed in solid and safe sea-worthy cases, the properly packaged and marked product could be delivered to any port or site as specified in the Contract by ship, plane or truck.

    What is the standard payment terms ?

    Usually we accept T/T and L/C.

    What kinds of guarantee provided?

    Product warranty for 12 months after commissioning on site or 18 month after delivery whichever come first; We offer lifelong follow-up services for our products, and we will response to client requirements within 24 working hours.

    If there is any other questions, please email me (oversea@gthec.cn) or chat with me on Whatsapp/Wechat /Mobilephone: +86 135 5586 1247

Description

Product Introduction

1. Advanced CFD, FEA technic is utilized in the designing process to ensure better technical solution.

Double Francis Turbine    Double Francis Turbine

Double Francis Turbine    Double Francis Turbine

Double Francis Turbine    Double Francis Turbine

Double Francis Turbine    Double Francis Turbine


2. CAE casting simulation is adopted for the produciton of casting parts, this advanced and reliable process plan could help effectively improve product quality.

3. All raw material strictly conform to international standard, such as ASTM, IEC,ISO etc. key component such as runners, guide vane is Forged and entire CNC machined.

Chemical Composition for ASTM A473 S41500 and ASTM A743 CA6NM(%)

Material No.CSiMnPSCrNiMo
ASTM A473 S41500≤0.05≤0.600.5-1.0≤0.030≤0.03011.5-14.03.5-5.50.40-0.80
ASTM A743 CA6NM≤0.06Max1.0Max1.0≤0.040≤0.03011.5-14.03.5-4.50.40-1.0


Mechanical Property for ASTM A473 S41500 and ASTM A743 CA6NM

Material No.σ0.2(Mpa)σb(Mpa)δ5(%)ψ(%)Akv (J/cm2)HB
ASTM A473 S41500≥620≥795≥15≥45≥50≤295
ASTM A743 CA6NM≥550≥755≥15≥35≥50≤285


4. State of the art machining and testing equipment, as well as licensed professional engineers all combined to help guarantee better product precisioness.

5. All product is subject to strict inspection according to international standards and client special requirements.

6. With the help of 3D Assembling, through motion simulation, the entire organization interaction can be seen at a glance. This helped a great deal for parts processing and pre-installation.

Double Francis Turbine

7. Each project will strictly follow manufacturying plan to ensure the delivery date.

Double Francis Turbine

8. ISO 9001 Quality Management system is carried out to ensure better management control

Double Francis Turbine

Applicable Standard

We could produce product according to inerntational standard and special client requirements. The standard we use include but not limited to the following:

IEC Standard fro equipment and testing

ASTM Standards

CCH70-3 Specification for inspection of steel castings fro hydraulic machines

EN (UNI-DIN) Standards

JIS Standards

ISO 1940-1-2003 Mechanical vibration-Balance quality requirements for rotors in a constant (rigid) state

ASME-Bioler and Pressure Vessel Code

- Section II - Material Specifications Part A-Ferrous

- Section VIII - Pressure Vessels-Division 1

- Section IX - Welding and Brazing Qualifications

Service

We dedicated to develop the best products and solutions for you in our role as specialists, to help unleashinging your potential and generate more power with our customized solutions!

Hydro Power Plant assessment

Inspections and offer customized solution

Plant Maintenance

Offer Spare parts

Troubleshooting

Consulting, installation guidance, site testing ect. field services

Training

Why Choose Us

More than 20 years of successful hydro turbines design,production and exporting experience, Long time certified suppliers for world renowned companies such as: MITSUBISHIHITACHI POWER SYSTEMS, LTD.(MHPS), Toshiba, GE, BHEL, ALSTOM, DEC,HEC, CHD ect.

Continuous investment in both state-of-the-art facilities and R&D support us to be strong and powerful in the market, high performance versus price ratio product , we could help achieving your goals within budget and time frame.No cheating, No excuse, No purposed delay is what we always try to guarantee our partners!

We got many national patents for our products, and all products conform to EU, ASTM, ISO, IEC, JIS etc. international standards.

Quick and professional response to your request for drawings, quotations, and answers about any technical problems. We do our best to realize our commitment to you that: what you see and hear is what you will get, whatever customer you are, big or small. In the mean time, we implement a quality information rapid feedback system and a standard parts management system.

Provide complete support at every step of your project, You will rely on a solid experienced partner that will be able to adapt to every situation and to help you take on all challenges that are part of any hydroelectric project. We dedicated to help unleashing your potential and generate more power with our customized solutions!

Reliable, Easy to work with, Knowledgeable and we add value, though we are not perfect, but we are learning and improving, we love what we do, we appreciate all the valuable customer to give us a chance to know and see if we are the Mr. RIGHT for each other. Right here waiting for YOU to start a rewarding journey together!

FAQ

Are you trading company or manufacturer ? Is OEM service available?

A: We are a factory with more than 20 years of successful hydro turbine manufacturing experience, OEM service is available.

How long is your delivery time?

A: Generally it is 120-270 working days upon contract signing and receipt of prepayment.

What parameters are needed for the turbine generator quotation?

A: Normally we need rated water head, rated flow, rated installed capacity,voltage, frequency and rotation speed. The more information the better.

Do you offer water turbine installation service?

A: Yes. Installation service is available upon request.

What kinds of test and inspection is carried out to ensure product quality?

A: Mechanical property, chemical composition, hardness, surface roughness, Dimension check, profile check, NDT Testing ( UT/MT/RT/PT), balancing, pressure test ect, is strictly carried out according to relevant international standards.

What is the standard packing and transportation means?

Product will be packed in solid and safe sea-worthy cases, the properly packaged and marked product could be delivered to any port or site as specified in the Contract by ship, plane or truck.

What is the standard payment terms ?

Usually we accept T/T and L/C.

What kinds of guarantee provided?

Product warranty for 12 months after commissioning on site or 18 month after delivery whichever come first; We offer lifelong follow-up services for our products, and we will response to client requirements within 24 working hours.

If there is any other questions, please email me (oversea@gthec.cn) or chat with me on Whatsapp/Wechat /Mobilephone: +86 135 5586 1247

Copyright © Shenyang Getai Hydropower Equipment Co., Ltd. All Rights Reserved | Sitemap | Powered by

WeChat

Whatsapp

Skype

E-mail